MRT Putrajaya Line
MRT Kajang Line and MRT Putrajaya Line
Project Value – AUD$10.18bn
EPCC Contractor
The success of MRT Kajang Line led to Gamuda delivering the MRT Putrajaya Line, solidifying the Group's reputation as the premier rail and infrastructure partner in Malaysia. As the turnkey contractor for the entire MRT Putrajaya Line alignment, Gamuda constructs the elevated and underground portions.
With 36 operational stations spanning 56.2 kilometres, of which 27 are elevated and nine underground, the second line of the KVMRT Project will serve a corridor population of approximately 2 million people, stretching from Kwasa Damansara to Putrajaya, Malaysia's federal administrative centre.
The VD TBM, optimised for the MRT Putrajaya Line, paved the way for Gamuda’s Autonomous Tunnel Boring Machine (A-TBM). Developed in-house, the A-TBM represents a major upgrade, using AI for autonomous control of tunnelling operations and managing steering, excavation, and slurry systems with minimal human input. This results in safer, more efficient tunnelling with improved accuracy and productivity. Its success has been demonstrated in the MRT Putrajaya Line, where it effectively navigated four geological formations.
This game-changing project significantly impacts the places it crosses, bringing the nation’s government agencies and suburbs around Klang Valley closer to the city centre.