Coffs Harbour Bypass
The Australian and NSW governments are funding the 14-kilometre Coffs Harbour bypass project. The bypass will boost the regional economy and improve connectivity, road transport efficiency and safety for local and interstate motorists.
Once complete, the Coffs Harbour bypass will save motorists more than 12 minutes in travel time, bypass up to 12 sets of traffic lights and remove about 12,000 vehicles a day from the centre of town, making Coffs Harbour an even better place to live, work and visit.
A joint venture between Gamuda Australia and Ferrovial are delivering the major package of work through a collaborative Design and Construct contract with Transport for NSW. With a focus on innovation, efficiency and value for money, the project includes three tunnels, about 12 kilometres of new road and about two kilometres of upgraded highway.
Gamuda’s exceptional health, safety and environmental management record has been recognised and rewarded multiple times by the British Safety Council, including the following :
- International Safety Award (with distinction) in 2015 for MRT Kajang Line
- International Safety Award (with distinction) in 2019 for MRT Putrajaya Line
- Five Star Occupational Health & Safety (OSH) Audit in 2018
- Sword of Honour in 2019
In Australia, Gamuda became the first Malaysian-based company to achieve accreditation from the Office of the Federal Safety Commissioner and we have pre-qualified to work with Transport for New South Wales roadworks level R5, bridgeworks level B4 and financial level F150+ (unlimited).
Internationally, we have maintained key safety certifications in accordance with ISO 9001 – Quality, ISO 14001 – Environmental and ISO 45001 – Occupational Health and Safety Management System Standards.
In fact, the British Safety Council awarded Gamuda the Sword of Honour in 2019 for excellence in safety.
General information
- Location: Coffs Harbour, New South Wales, Australia
- Contract award date: 19 June 2022
- Contract type: Design and Construct
- Delivery Partners: Joint venture between Ferrovial and Gamuda Australia
- Project completion: 2027
- Project value: $1.35 billion
Gamuda is a leader in design, using the latest technology and tools in our construction and infrastructure projects – be it in digital industrialised building system (IBS), 4D and 5D building information modelling (BIM) systems or in procurement systems.
Certified by the Building Research Establishment as a BIM Level 2 Prepared Business, Gamuda is on the forefront of this transformative technology.
We have even developed our own augmented reality platform, called BIMAR, in which we can overlay virtual design and construction elements with real-time worksite images.
BIMAR allows us to undertake a site visit with clients before construction even begins, which means we can identify and rectify any issues early and efficiently.
Taking our BIM capabilities even further, Gamuda is revolutionising the construction industry by incorporating digital design tools, automation and robotic construction to prefabricate up to 85% components for residential, industrial and public buildings.
Not only does this reduce construction time by half, Gamuda’s IBS has been independently verified by the Construction Research Institute of Malaysia to increase builder productivity by 300% and equip contractors for the Industry 4.0 revolution.
Gamuda has pioneered the use of variable density tunnel boring machines (VD TBMs) to manage the risks associated with tunnelling amongst even the most challenging geological formations.
The VD TBM is the world’s first automated system comprising custom artificial intelligence control algorithms, improving safety, quality and durability.
Exclusively available to Gamuda, this proprietary technology was awarded the Technical Product/Equipment Innovation of the Year award at the 2019 International Tunnelling and Underground Space Association (ITA) Tunnelling Awards in the USA.
Gamuda has been globally recognised for developing innovative engineering solutions. From the world’s first autonomous tunnel boring machine, to the world’s first tunnel with dual functionality for both traffic and stormwater (SMART).
This innovation allowed Gamuda to safely tunnel through Kuala Lumpur’s limestone rock during the delivery of the MRT Kajang Line and MRT Putrajaya Line. During use, the TBM pushed slurry into cavities detected in the limestone rock ahead of the machine’s cutter. By varying the slurry density the tunnel face was stabilised, minimising the risk of sinkholes appearing on the land surface. It prevented tunnel collapse and protected the TBM from damage.
Key features
- 14km of new and upgraded four-lane divided highway bypassing the Coffs Harbour CBD and urban area
- Three tunnels (approximately 1km in total) at Roberts Hill, Shephards Lane and Gatelys Road
- A new bus interchange and pedestrian footbridge servicing Kororo Public School
- Three grade-separated interchanges
- Upgrade of the existing Pacific Highway between Korora Hill and the dual carriageway at Sapphire
- Local access and service roads adjacent to sections of the new highway providing connections for local residents and businesses.
More information on the project is available on Transport for NSW’s project portal.
An integral component of our commitment to sustainable and efficient use of resources is reflected in Gamuda’s circular construction framework. During the planning, design and execution phases, meticulous integration between design and construction is implemented especially to successfully achieve sustainability-related project goal and the process through which the project is managed.
With a commitment to be carbon neutral by 2040, Gamuda’s ecological stewardship programmes include the rehabilitation of wetlands in Malaysia, investment in the planting of native species of trees, development of urban parkland and a commitment to a reduction of waste through the circular economy.
Gamuda strive for continuous improvement and data-driven transformation, integrating business processes and operations to make disruptive business decisions. Gamuda’s technological advances in building information modelling (BIM) and industrialised building systems (IBS) not only ensure precision and quality, but enabled greater efficiency and productivity.
Gamuda is committed to operating with minimal disruption to the environment, with a guiding principle of giving back to the planet and local communities. Gamuda has built a diverse, vibrant workforce and continues to invest in our people to enable them to excel.
One of our key achievements is the development of the Enabling Academy in Malaysia to help people with autism gain sustainable employment.
Gamuda is committed to operating with minimal disruption to the environment, with a guiding principle of giving back to the planet and local communities. Gamuda has built a diverse, vibrant workforce and continues to invest in our people to enable them to excel.
One of our key achievements is the development of the Enabling Academy in Malaysia to help people with autism gain sustainable employment.
Environmental Protection Licence
Gamuda Australia and Laing O’Rourke Consortium is the holder of the Environmental Protection Licence for the Sydney Metro West – Western Tunnelling Package. A copy of the licence can be downloaded here.
Gamuda is a leader in design, using the latest technology and tools in our construction and infrastructure projects – be it in digital industrialised building system (IBS), 4D and 5D building information modelling (BIM) systems or in procurement systems.
Certified by the Building Research Establishment as a BIM Level 2 Prepared Business, Gamuda is on the forefront of this transformative technology.
We have even developed our own augmented reality platform, called BIMAR, in which we can overlay virtual design and construction elements with real-time worksite images.
BIMAR allows us to undertake a site visit with clients before construction even begins, which means we can identify and rectify any issues early and efficiently.
Taking our BIM capabilities even further, Gamuda is revolutionising the construction industry by incorporating digital design tools, automation and robotic construction to prefabricate up to 85% components for residential, industrial and public buildings.
Not only does this reduce construction time by half, Gamuda’s IBS has been independently verified by the Construction Research Institute of Malaysia to increase builder productivity by 300% and equip contractors for the Industry 4.0 revolution.
Gamuda has pioneered the use of variable density tunnel boring machines (VD TBMs) to manage the risks associated with tunnelling amongst even the most challenging geological formations.
The VD TBM is the world’s first automated system comprising custom artificial intelligence control algorithms, improving safety, quality and durability.
Exclusively available to Gamuda, this proprietary technology was awarded the Technical Product/Equipment Innovation of the Year award at the 2019 International Tunnelling and Underground Space Association (ITA) Tunnelling Awards in the USA.
Gamuda has been globally recognised for developing innovative engineering solutions. From the world’s first autonomous tunnel boring machine, to the world’s first tunnel with dual functionality for both traffic and stormwater (SMART).
This innovation allowed Gamuda to safely tunnel through Kuala Lumpur’s limestone rock during the delivery of the MRT Kajang Line and MRT Putrajaya Line. During use, the TBM pushed slurry into cavities detected in the limestone rock ahead of the machine’s cutter. By varying the slurry density the tunnel face was stabilised, minimising the risk of sinkholes appearing on the land surface. It prevented tunnel collapse and protected the TBM from damage.
Environmental Protection Licence
Ferrovial Gamuda joint venture is the holder of the Environmental Protection Licence for the Coffs Harbour bypass project. A copy of the licence can be downloaded here.
PDF 29 MB
PDF 494 KB
Gamuda is a leader in design, using the latest technology and tools in our construction and infrastructure projects – be it in digital industrialised building system (IBS), 4D and 5D building information modelling (BIM) systems or in procurement systems.
Certified by the Building Research Establishment as a BIM Level 2 Prepared Business, Gamuda is on the forefront of this transformative technology.
We have even developed our own augmented reality platform, called BIMAR, in which we can overlay virtual design and construction elements with real-time worksite images.
BIMAR allows us to undertake a site visit with clients before construction even begins, which means we can identify and rectify any issues early and efficiently.
Taking our BIM capabilities even further, Gamuda is revolutionising the construction industry by incorporating digital design tools, automation and robotic construction to prefabricate up to 85% components for residential, industrial and public buildings.
Not only does this reduce construction time by half, Gamuda’s IBS has been independently verified by the Construction Research Institute of Malaysia to increase builder productivity by 300% and equip contractors for the Industry 4.0 revolution.
Gamuda has pioneered the use of variable density tunnel boring machines (VD TBMs) to manage the risks associated with tunnelling amongst even the most challenging geological formations.
The VD TBM is the world’s first automated system comprising custom artificial intelligence control algorithms, improving safety, quality and durability.
Exclusively available to Gamuda, this proprietary technology was awarded the Technical Product/Equipment Innovation of the Year award at the 2019 International Tunnelling and Underground Space Association (ITA) Tunnelling Awards in the USA.
Gamuda has been globally recognised for developing innovative engineering solutions. From the world’s first autonomous tunnel boring machine, to the world’s first tunnel with dual functionality for both traffic and stormwater (SMART).
This innovation allowed Gamuda to safely tunnel through Kuala Lumpur’s limestone rock during the delivery of the MRT Kajang Line and MRT Putrajaya Line. During use, the TBM pushed slurry into cavities detected in the limestone rock ahead of the machine’s cutter. By varying the slurry density the tunnel face was stabilised, minimising the risk of sinkholes appearing on the land surface. It prevented tunnel collapse and protected the TBM from damage.
Community engagement
At Gamuda, we work with local communities to create social value and deliver positive contributions to society.
Engagement with Aboriginal and Torres Strait Islander Peoples, forms an integral part of all projects we undertake, and we greatly value the opportunity to develop equitable and inclusive solutions.
Community notifications and upcoming work
A copy of all notifications can be found on the Sydney Metro West website.
Community notifications and upcoming work
A copy of all notifications and project updates are hosted here by Transport for NSW.
Environmental management plans and approval documents
All Sydney Metro West environmental management documentation is available from the Sydney Metro West document library.
Gamuda is a leader in design, using the latest technology and tools in our construction and infrastructure projects – be it in digital industrialised building system (IBS), 4D and 5D building information modelling (BIM) systems or in procurement systems.
Certified by the Building Research Establishment as a BIM Level 2 Prepared Business, Gamuda is on the forefront of this transformative technology.
We have even developed our own augmented reality platform, called BIMAR, in which we can overlay virtual design and construction elements with real-time worksite images.
BIMAR allows us to undertake a site visit with clients before construction even begins, which means we can identify and rectify any issues early and efficiently.
Taking our BIM capabilities even further, Gamuda is revolutionising the construction industry by incorporating digital design tools, automation and robotic construction to prefabricate up to 85% components for residential, industrial and public buildings.
Not only does this reduce construction time by half, Gamuda’s IBS has been independently verified by the Construction Research Institute of Malaysia to increase builder productivity by 300% and equip contractors for the Industry 4.0 revolution.
Gamuda has pioneered the use of variable density tunnel boring machines (VD TBMs) to manage the risks associated with tunnelling amongst even the most challenging geological formations.
The VD TBM is the world’s first automated system comprising custom artificial intelligence control algorithms, improving safety, quality and durability.
Exclusively available to Gamuda, this proprietary technology was awarded the Technical Product/Equipment Innovation of the Year award at the 2019 International Tunnelling and Underground Space Association (ITA) Tunnelling Awards in the USA.
Gamuda has been globally recognised for developing innovative engineering solutions. From the world’s first autonomous tunnel boring machine, to the world’s first tunnel with dual functionality for both traffic and stormwater (SMART).
This innovation allowed Gamuda to safely tunnel through Kuala Lumpur’s limestone rock during the delivery of the MRT Kajang Line and MRT Putrajaya Line. During use, the TBM pushed slurry into cavities detected in the limestone rock ahead of the machine’s cutter. By varying the slurry density the tunnel face was stabilised, minimising the risk of sinkholes appearing on the land surface. It prevented tunnel collapse and protected the TBM from damage.
Environmental management plans and approval documents
All Coffs Harbour bypass project environmental management documents are available from the Coffs Harbour bypass project document library.
Gamuda is a leader in design, using the latest technology and tools in our construction and infrastructure projects – be it in digital industrialised building system (IBS), 4D and 5D building information modelling (BIM) systems or in procurement systems.
Certified by the Building Research Establishment as a BIM Level 2 Prepared Business, Gamuda is on the forefront of this transformative technology.
We have even developed our own augmented reality platform, called BIMAR, in which we can overlay virtual design and construction elements with real-time worksite images.
BIMAR allows us to undertake a site visit with clients before construction even begins, which means we can identify and rectify any issues early and efficiently.
Taking our BIM capabilities even further, Gamuda is revolutionising the construction industry by incorporating digital design tools, automation and robotic construction to prefabricate up to 85% components for residential, industrial and public buildings.
Not only does this reduce construction time by half, Gamuda’s IBS has been independently verified by the Construction Research Institute of Malaysia to increase builder productivity by 300% and equip contractors for the Industry 4.0 revolution.
Gamuda has pioneered the use of variable density tunnel boring machines (VD TBMs) to manage the risks associated with tunnelling amongst even the most challenging geological formations.
The VD TBM is the world’s first automated system comprising custom artificial intelligence control algorithms, improving safety, quality and durability.
Exclusively available to Gamuda, this proprietary technology was awarded the Technical Product/Equipment Innovation of the Year award at the 2019 International Tunnelling and Underground Space Association (ITA) Tunnelling Awards in the USA.
Gamuda has been globally recognised for developing innovative engineering solutions. From the world’s first autonomous tunnel boring machine, to the world’s first tunnel with dual functionality for both traffic and stormwater (SMART).
This innovation allowed Gamuda to safely tunnel through Kuala Lumpur’s limestone rock during the delivery of the MRT Kajang Line and MRT Putrajaya Line. During use, the TBM pushed slurry into cavities detected in the limestone rock ahead of the machine’s cutter. By varying the slurry density the tunnel face was stabilised, minimising the risk of sinkholes appearing on the land surface. It prevented tunnel collapse and protected the TBM from damage.
MASTER Community Agreement Report 2 column
MASTER Plans 2 column
PDF 173 KB
PDF 165 KB
PDF 137 KB
MASTER Reports 2 column
PDF 1 MB
PDF 197 KB
PDF 1 MB
PDF 323 KB
PDF 305 KB
PDF 354 KB
PDF 239 KB
PDF 306 KB
PDF 2.6 MB
PDF 137 KB
PDF 1.4 MB
PDF 147 KB
PDF 115 KB
PDF 162 KB
PDF 1MB
PDF 440 KB
PDF 413 KB
As part of our commitment to the surrounding community, we publish environmental management plans and regular reports from the project below:
PDF 173 KB
PDF 165 KB
PDF 137 KB
PDF 1 MB
PDF 197 KB
PDF 1 MB
PDF 323 KB
PDF 305 KB
PDF 354 KB
PDF 239 KB
PDF 306 KB
PDF 2.6 MB
PDF 137 KB
PDF 1.4 MB
PDF 147 KB
PDF 115 KB
PDF 162 KB
PDF 1MB
PDF 440 KB
PDF 413 KB
Gamuda is a leader in design, using the latest technology and tools in our construction and infrastructure projects – be it in digital industrialised building system (IBS), 4D and 5D building information modelling (BIM) systems or in procurement systems.
Certified by the Building Research Establishment as a BIM Level 2 Prepared Business, Gamuda is on the forefront of this transformative technology.
We have even developed our own augmented reality platform, called BIMAR, in which we can overlay virtual design and construction elements with real-time worksite images.
BIMAR allows us to undertake a site visit with clients before construction even begins, which means we can identify and rectify any issues early and efficiently.
Taking our BIM capabilities even further, Gamuda is revolutionising the construction industry by incorporating digital design tools, automation and robotic construction to prefabricate up to 85% components for residential, industrial and public buildings.
Not only does this reduce construction time by half, Gamuda’s IBS has been independently verified by the Construction Research Institute of Malaysia to increase builder productivity by 300% and equip contractors for the Industry 4.0 revolution.
Gamuda has pioneered the use of variable density tunnel boring machines (VD TBMs) to manage the risks associated with tunnelling amongst even the most challenging geological formations.
The VD TBM is the world’s first automated system comprising custom artificial intelligence control algorithms, improving safety, quality and durability.
Exclusively available to Gamuda, this proprietary technology was awarded the Technical Product/Equipment Innovation of the Year award at the 2019 International Tunnelling and Underground Space Association (ITA) Tunnelling Awards in the USA.
Gamuda has been globally recognised for developing innovative engineering solutions. From the world’s first autonomous tunnel boring machine, to the world’s first tunnel with dual functionality for both traffic and stormwater (SMART).
This innovation allowed Gamuda to safely tunnel through Kuala Lumpur’s limestone rock during the delivery of the MRT Kajang Line and MRT Putrajaya Line. During use, the TBM pushed slurry into cavities detected in the limestone rock ahead of the machine’s cutter. By varying the slurry density the tunnel face was stabilised, minimising the risk of sinkholes appearing on the land surface. It prevented tunnel collapse and protected the TBM from damage.
As part of our commitment to the surrounding community, we publish environmental management plans and regular reports from the project below:
Gamuda is a leader in design, using the latest technology and tools in our construction and infrastructure projects – be it in digital industrialised building system (IBS), 4D and 5D building information modelling (BIM) systems or in procurement systems.
Certified by the Building Research Establishment as a BIM Level 2 Prepared Business, Gamuda is on the forefront of this transformative technology.
We have even developed our own augmented reality platform, called BIMAR, in which we can overlay virtual design and construction elements with real-time worksite images.
BIMAR allows us to undertake a site visit with clients before construction even begins, which means we can identify and rectify any issues early and efficiently.
Taking our BIM capabilities even further, Gamuda is revolutionising the construction industry by incorporating digital design tools, automation and robotic construction to prefabricate up to 85% components for residential, industrial and public buildings.
Not only does this reduce construction time by half, Gamuda’s IBS has been independently verified by the Construction Research Institute of Malaysia to increase builder productivity by 300% and equip contractors for the Industry 4.0 revolution.
Gamuda has pioneered the use of variable density tunnel boring machines (VD TBMs) to manage the risks associated with tunnelling amongst even the most challenging geological formations.
The VD TBM is the world’s first automated system comprising custom artificial intelligence control algorithms, improving safety, quality and durability.
Exclusively available to Gamuda, this proprietary technology was awarded the Technical Product/Equipment Innovation of the Year award at the 2019 International Tunnelling and Underground Space Association (ITA) Tunnelling Awards in the USA.
Gamuda has been globally recognised for developing innovative engineering solutions. From the world’s first autonomous tunnel boring machine, to the world’s first tunnel with dual functionality for both traffic and stormwater (SMART).
This innovation allowed Gamuda to safely tunnel through Kuala Lumpur’s limestone rock during the delivery of the MRT Kajang Line and MRT Putrajaya Line. During use, the TBM pushed slurry into cavities detected in the limestone rock ahead of the machine’s cutter. By varying the slurry density the tunnel face was stabilised, minimising the risk of sinkholes appearing on the land surface. It prevented tunnel collapse and protected the TBM from damage.
Local partnerships
At Gamuda, we believe in creating social value for local communities through partnerships that foster collaboration.
By 2022 there will be the need for 500 specially trained TBM tunnelling crew in projects across Australia. Our mission is to invest in and train specialist TBM crew members in tunnelling academies here in Australia, as we have done in Asia, working with our community education partners to make this happen.
To this end, in late 2020 Gamuda signed MoUs with Registered Training Organisations HSAS and TAFE NSW as prospective delivery partners.
- Occupational Health and Safety ISO 45001
- Quality Management ISO 9001
- Environmental Management ISO 14001
- Approved by the Office of the Federal Safety Commissioner
- Australian Government Building and Construction Work Health and Safety Scheme
- AEO (Authorised Engineering Organisation) accredited by Transport for NSW
Sustainability
Economic, environmental and social sustainability has always been Gamuda’s approach. In everything we do we Build Right. For Life. Our value creation strategy in the sustainability framework, anchored on three key pillars:
Our people are the cornerstone of our business and we are committed to their growth and development through a wide range of programmes and initiatives that include our Tunnelling Training Academy and our Enabling Academy.
Gamuda’s technological advances in building information modelling (BIM) and industrialised building systems (IBS) not only ensure precision and quality, they are also an integral component of our commitment to sustainable and efficient use of resources during the planning, design and execution phase. Championing this technology allows us to identify potential issues, reducing costly changes and wastage down the track.
With a commitment to be carbon neutral by 2040, Gamuda’s ecological stewardship programmes include the rehabilitation of wetlands in Malaysia, investment in the planting of native species and development of urban parkland and a commitment to a reduction of waste through the circular economy.
Gamuda has an excellent track record of creating jobs and training during the project delivery.
In 2011, Gamuda set up Asia’s first Tunnelling Training Academy which has since trained thousands of tunnel engineers and skilled superintendents. We have plans to replicate the Tunnel Training Academy in New South Wales to upskill the local construction workforce should the current tenders be successful.
Gamuda recognises the challenges faced by many people on the autism spectrum in securing meaningful employment, despite their myriad skills and areas of expertise.
In light of this, in 2013 Gamuda launched Project Differently Abled, which ultimately resulted in 20 people living with autism being employed by Gamuda.
The project was also a precursor to the Enabling Academy, established in 2017, which prepares people living with autism for gainful and sustainable employment.
Since 2017 more than a dozen people each year have graduated from the Gamuda Enabling Academy, each of whom have gained employment across our 29 partner companies.
At Gamuda we believe in creating social value for local communities through partnerships that foster collaboration.
By 2022 there will be the need for 500 specially trained TBM tunnelling crew in projects across Australia. Our mission is to invest in and train specialist TBM crew members in tunnelling academies here in Australia, as we have done in Asia, working with our community education partners to make this happen.
To this end, in late 2020 Gamuda signed MoUs with Registered Training Organisations HSAS and TAFE NSW as prospective delivery partners.
Gamuda is committed to operating with minimal disruption to the environment, with a guiding principle of giving back to the planet and local communities. Gamuda has built a diverse, vibrant workforce and continues to invest in our people to enable them to excel.
One of our key achievements is the development of the Enabling Academy in Malaysia to help people with autism gain sustainable employment.
Gamuda is committed to operating with minimal disruption to the environment, with a guiding principle of giving back to the planet and local communities. Gamuda has built a diverse, vibrant workforce and continues to invest in our people to enable them to excel.
One of our key achievements is the development of the Enabling Academy in Malaysia to help people with autism gain sustainable employment.
Local Partnerships
At Gamuda we believe in creating social value for local communities through partnerships that foster collaboration.
Want to grow your career with us?
Gamuda is excited to be part of this project and, together with Ferrovial Construction, will be focussed on combining engineering smarts with environmental and sustainability innovation to ensure a positive legacy for the people of Coffs Harbour far beyond construction.