Sungai Selangor Water Supply Scheme (Phase 3)
Project Value – AUD$730m
EPCC and Operator
The Sungai Selangor Water Supply Scheme (Phase 3) entailed the design and construction of a 110-metre-high regulating dam, river intake works, pipelines, and two water treatment plants which were 250 mld and 800 mld respectively.
In Malaysia alone, Gamuda’s total water concessions provide 2,000 million litres of potable water per day (mld) to more than 3 million people.
Not only are Gamuda’s dams and water treatment projects feats of engineering, they also have a profoundly positive impact on the quality of life enjoyed by the local communities. They have improved the quality and safety of water by decreasing contamination and reducing hazardous waste.
Project Snapshots
1 / 3